Chem-Pak
·
Aerosol

Chem-Pak Aerosol Automation

Complete aerosol assembly automation delivering 35% cost reduction within 18 months.

The Challenge

Chem-Pak, a leading aerosol contract manufacturer, was struggling with aging equipment that couldn't keep pace with customer demands. Maintenance costs were climbing, downtime was impacting delivery schedules, and they needed a solution that would position them for long-term growth.

The Solution

Haumiller implemented a comprehensive aerosol automation upgrade featuring our proven overcapper, valve placer, and spray tip applicator machines. The integrated line was designed for maximum uptime and minimal maintenance.

The project included:

Haumiller 4400 Overcapper for high-speed cap placement at 450 parts per minute. Haumiller 5200 Valve Placer with Bag-On-Valve compatibility. Integrated line controls with real-time production monitoring. Comprehensive training and ongoing support program.

The Results

Within 18 months of implementation, Chem-Pak achieved a 35% reduction in per-unit costs. The new equipment's reliability dramatically reduced unplanned downtime, and the increased capacity allowed them to take on new customer contracts they previously couldn't service.

THE BUILD

Inside the Project

Provide insights into our company

Let's Talk About Your Project

Have a challenge? We're here to help. Reach out and let's explore solutions together.
Send us a message
Choose the type of inquiry and tell us more about what you need.
Full Name
Email
COMPANY
phone
Preferred time
Message
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
sales@haumiller.com
Feel free to reach out via email if you have any questions before our call!
+1 (847) 695-9111
You can reach out to us by phone to discuss your needs.
370 Joseph Drive, South Elgin, IL 60177
We are conveniently located near public transport and parking.